Mayo-dawson city transmission Project The project involved the full design, procurement, construction, commissioning, training of client personnel and start-up of a 223 km transmission system (which included substations, a synchronous condenser, distribution under...
by chantgroupblog | Jan 27, 2022
brilliant expansion Project The Brilliant Expansion Project entailed the addition of a second powerhouse on the Left Bank at the Brilliant Dam, an existing generating facility on the Kootenay River in Southern BC. Our work Chant Limited was part of The Brilliant...
by chantgroupblog | Jan 27, 2022
Talbot dam kirkfield bundle Public Works and Government Services Canada, partnered with Parks Canada Agency to deliver a specific infrastructure project on the Trent-Severn Waterway. The objective of the Project was to improve the structural integrity of water...
by chantgroupblog | Jan 21, 2022
Shikwamkwa Replacement Dam Project The project involved the replacement of an existing earth fill dam on the headwaters of the Michipicoten River near Wawa, Ontario. The original structure had been constructed across a deep fluvial valley without a positive cutoff...
by chantgroupblog | Jan 21, 2022
High Falls Redevelopment Project The project involved the redevelopment of an existing hydropower site on the Michipicoten River near Wawa, Ontario. The work included a new power canal, intake structure, penstocks, powerhouse, installation of twin 22.5 MW Kaplan...
by chantgroupblog | Jan 21, 2022
Fort ChipewyanThird Lake Power Plant The project involved severe winter construction and equipment installation works for a power plant located in Fort Chipewyan, Alberta, approximately 700 km northeast of Edmonton and 280 km north of Ft. McMurray. Our work ATCO...
by chantgroupblog | Jan 21, 2022
Essex Dam Crest modification and inflatable flashboard The crest modification project involved the construction of three separate cofferdams, the placement of reinforced concrete on the existing deck, the installation of an Obermeyer Inflatable Flashboard and the...
by chantgroupblog | Jan 21, 2022
dorena lake Hydroelectric project The project involved the construction of a gated steel penstock from Dorena Lake through an existing USACE concrete dam, a valve and syphon house, a new powerhouse, installation of 1.2 MW horizontal Francis and 3.5 MW vertical Kaplan...
by chantgroupblog | Jan 21, 2022
caribou mountain wind park Substation and Collector System The project included a new 34.5/138 kV substation and 30 km of 34.5 kV collection system for this 33 – 3 MW turbine wind park located 70 miles west of Bathurst, New Brunswick. Our work Chant’s scope of work...
by chantgroupblog | Jan 20, 2022
pawtucket dam inflatable crest gate project The project consisted of the replacement of traditional wooden flashboards with a mechanical gate system along the crest of an existing 1,093’ long, 15’ high historic dam on the Merrimack River in Lowell, Massachusetts,...
by chantgroupblog | Jan 20, 2022
box canyon hydroelectric Project Located on Howe Sound about 45 km north of Vancouver, British Columbia, this 16 MW run-of-river hydroelectric project includes three high elevation water intake diversions for Box Canyon, Marty and Cascara Creeks, a water conveyance...