Nobel Substation – Phase III

Along with its subcontractors, Chant Group was responsible for the Nobel Substation civil construction and electrical installation, including assisting ABB with the commissioning of its supplied electrical components and control building instrumentation.

Scope of Work:
  • All civil works (site grading, site drainage, access roads, pier excavation/backfill)
  • Structural works (structure concrete, tower installation, site fencing)
  • Control building (foundation, building construction, mechanical/electrical/HVAC, finishing)
  • Electrical and related works (indoor/outdoor equipment installation, protection and control facilities, steel structure install, switch installation, transformer installation, ground grid, raceway and cable install, fiber optic install, standby generator install and commissioning support)

LOCATION / ON, Canada CLIENT / ABB STATUS / Completed YEAR / 2010 PROJECT VALUE / $8.3 Million