Trent-Severn Waterway Dam Replacement (Central Sector) – On September 9th Chant conducted a Pre-Site visit to inspect the 8+ planned work sites on the Trent-Severn Waterway and prepare a report on possible laydown areas for the project . Damage to the dams on these sites was immediately visible and in some cases severe. Chant will be cooperating with Ellis Don in the proposal for the Construction Management position.